The equipment is mainly comprised of in-feeding roller conveyor, shot blasting chamber, painting spray booth, drying booth, out-feeding roller conveyor, dust removing system and electrical control system.
Working Principle:
The equipment is high efficiency continuous working production line. The steel plate will be delivered into shot blasting chamber and accept shot blasting from different blasting turbine, thus rust, oxide layers will be cleaned quickly and the surface quality can reach Sa2.5. During blasting, the mixture of Steel Shots and dust will be collected by screw conveyor to bucket elevator and then separator for recycle. The dust produced by blasting will be filtered by pulse jet dust collector and then discharge qualified air into high sky.
After shot blasting, the shots clean off system including scrapper, roller brush and high pressure air fan will clean the steel shots on the top surface of steel plate to make sure no steel shots on it. Then the steel plate will be delivered into painting spray booth for painting. After painting, the steel plate will be delivered into drying booth for drying. The drying booth has two type: electrical heating or oil/gas burning heating. After dying, the steel plate will be sent out to out-feeding roller conveyor.
Application: Shipbuilding & Shipyard | Marine Offshore Engineering | Pressure Vessel Manufacturing | Engineering Machinery Manufacturing | Petroleum Oil & Chemical Industry etc.
STEEL PLATE PRESERVATION LINE - BLASTING PAINTING DRYING |
||||
Model |
KLY1500-4 |
KLY2000-6 |
KLY2500-6 |
KLY3000-6 |
Steel Plate Size (mm) Thick × Width × Length |
(4~60)×1500 ×6000 |
(4~60)×2000 ×9000 |
(4~60)×2500 ×12000 |
(4~60)×3000 ×12000 |
Working Speed (m/min) |
0.5~3.0 |
|||
Shot Blasting Volume (kg/min) |
290×4 |
250×6 |
290×6 |
360×6 |
De-dust Air Volume (m3/hr) |
25600 |
25600 |
32500 |
32500 |
Surface Quality After Blasting |
Sa 2.5 GB8923-88(ISO8501) |
|||
Roughness After Blasting |
Ra20~75 |
|||
Painting Type |
Airless Painting Spray 45:1 |
|||
Paint Film Thickness |
15~45μm |
|||
Drying Temperature |
45~70°C |
STEEL PLATE PRESERVATION LINE - BLASTING PAINTING DRYING |
||||
Model |
KLY3500-8 |
KLY4000-8 |
KLY4500-10 |
KLY5000-10 |
Steel Plate Size (mm) Thick × Width × Length |
(4~60)×3500 ×12000 |
(4~60)×4000 ×12000 |
(4~60)×4500 ×12000 |
(4~60)×5000 ×12000 |
Working Speed (m/min) |
0.5~4.0 |
|||
Shot Blasting Volume (kg/min) |
350×8 |
480×8 |
480×10 |
480×10 |
De-dust Air Volume (m3/hr) |
39500 |
39500 |
48500 |
48500 |
Surface Quality After Blasting |
Sa 2.5 GB8923-88(ISO8501) |
|||
Roughness After Blasting |
Ra20~75 |
|||
Painting Type |
Airless Painting Spray 45:1 |
|||
Paint Film Thickness |
15~45μm |
|||
Drying Temperature |
45~70°C |
- We have the policy to improve our equipment continuously & shall reserve the rights to change the dimensions and specs without prior notice.
Contact:Carl Chen
Phone: +86-139 1469 8671
Email:kholeeblasting@gmail.com
Add:Dalong Industrial Park, Xituan, Dafeng, Yancheng, Jiangsu, China 224125
We chat